Features
The installation requirements of the heat meter
1.Before installation, check the pipelines in the cleansing system thoroughly and remove silk,
hemp ,sand ,gravel and any other masses to avoid any flow hindrance.
2.The flow meter should be installed in horizontal level, with the display window
facing upward.
3.The diameter of the front and the back pipes should fit the flow meter
4.10DN straight pipeline and 5DN straight line should be saved (DN is what we call the diameter of the heat meter)
5.Must use the gasket and connecting pipeline specially designed and manufactured by
our company.
6. The sewage filter and the valve should be fixed at both ends of the flow meter for the
convenience of filth removing, maintaining and replacing.
7. After the installation ,seal between the connecting bolt of the capsule and the heat meter, between the temperature measuring ball valve and the platinum resistor.
8.Best water inflow and outflow pipeline options for easy fixing.
Nominal Diameter | 15 | 20 | 25 | 32 | 40 | |
Dimension | L | 110 | 130 | 130 | 200 | 200 |
W | 87 | 87 | 87 | 85 | 85 | |
H | 101 | 101 | 125 | 125 | 130 | |
Max flow (m3/h) | 3 | 5 | 7 | 12 | 20 | |
Norm flow(m3/h) | 1.5 | 2.5 | 3.5 | 6 | 10 | |
Min flow(m3/h) | 0.03 | 0.05 | 0.07 | 0.12 | 0.2 | |
Max flow reading | 999999.99(m3) | |||||
Max heat reading | (KW·h) | |||||
Power supply | 3.6VDC | |||||
Battery life | >6 years ( Lithium battery) | |||||
Accuracy class | Class 2 | |||||
Communication mode | Infrared interface , M-BUS/RS485 | |||||
Press loss | ≤ 0.025 Mpa ( under normal flow) | |||||
IP class | IP 68 | |||||
Temperature range | (0--95) ℃ | |||||
Temperature difference | (3--60) k | |||||
Starting temperature difference | 0.01k | |||||
Temperature sensor | Pt 1000 | |||||
Ambient temperature | +5℃ -- +55℃ | |||||
Ambient level | Level A | |||||
Installation | Horizontal/ vertical installation | |||||
Monitor | 8 digits | |||||
Length of temperature sensor | 1.5m | |||||
Working current | 45uA | |||||
Data storage | Store historical data up to last 24 months |
The installation requirements of the heat meter
Before installation, check the pipelines in the cleansing system thoroughly and remove silk, hemp ,sand ,gravel and any other masses to avoid any flow hindrance.
1.The flow meter should be installed in horizontal level, with the display window facing upward.
ultrasonic heat meter
2.The water flows in the direction accordance with the arrow mark
radiator heat meter
3.The diameter of the front and the back pipes should fit the flow meter
battery for gas meter heat meter
4.10DN straight pipeline and 5DN straight line should be saved (DN is what we call the diameter of the heat meter)
heat flow meter
5.Must use the gasket and connecting pipeline specially designed and manufactured by our company.
6.The sewage filter and the valve should be fixed at both ends of the flow meter for the convenience of filth removing, maintaining and replacing.
7.After the installation ,seal between the connecting bolt of the capsule and the heat meter, between the temperature measuring ball valve and the platinum resistor.
8.Best water inflow and outflow pipeline options for easy fixing.
The installation of temperature sensor
One temperature sensor with red tag is to be installed inside the heat measuring meter, the other sensor with blue tag is to be built inside the temperature measuring ball valve.
The lead wire of the temperature sensor is not allowed to be lengthen, shorten or changed casually.
Performance
Household mechanical heat meter bears the features of high accuracy, steady operation, long using life, no subjecting to inferior water and low maintaining cost .It can be widely used in concentrated or regional heat supply system or separate household measuring in central air condition system
Being packed according to the international standard is to guarantee safe delivery during the transportation.
?Professional manufacturer with internationally standard production lines and a devoted technical team.
?Strict test procedure with advanced test equipment
?Responsive and responsible service team.
?Door to door service when needed.
?Helpful and enthusiastic in developing the buyers’ business.
?Treat your career as our career.
Certifications:
Welcome to contact us:
For sales or information inquiry, please contact us in the following ways:
Mob:+8613588948309
Tel: +86-
Skype:+8613588948309
Trade messenger: barbara ye